Wetlands protection and parking lot run-off
(1 post) (1 voice)-
The newly proposed, smaller Stop & Shop project would incorporate porous pavement over a section of the parking lot. As a result of this and the smaller scale (no gas station or separate retail structure), the system for dealing with run-off was changed. When questions were asked about the new parking lot material, a representative of Stop & Shop stated that it the surface could break up due to freeze/thaw cycles, and if this happened it would be removed and replaced with a nonporous surface. He did not say whether or not the new drainage and catch basis system was adequate whether or not they later made this change.Posted 2 years ago #